Our Work Gallery

A visual showcase of the projects we deliver—built with precision, speed, and engineering confidence.

Our gallery highlights real-world applications of screw piling systems across infrastructure, energy, and utility projects. Each project reflects our commitment to quality, safety, and performance in the field. These projects are great examples of how our true pitch screw piles can be fabricated for a range of applications. 

Featured Projects

Explore a selection of completed and ongoing projects where True Pitch Screw Piles provided efficient, reliable foundation solutions.

Transmission Tower Foundation Project

Engineered screw piles were installed to support transmission towers in variable soil conditions.

Solar Farm Foundation Project

True Pitch Screw Piles provided a reliable and sustainable foundation solution for solar panel structures.

Utility Infrastructure Support Project

Screw piles were used to support critical utility infrastructure in a restricted-access area. Installation is low-vibration.

Industrial Equipment Foundation Project

Screw piling systems were engineered to support heavy industrial equipment requiring high load capacity and precise installation.

Projects

Hut8 Bitcoin Mining Facility – Medicine Hat, AB

Inland was contracted directly by Orbis Engineering to engineer, fabricate, and install screw piles for the Hut 8 Bitcoin Mining Facility in Medicine Hat, Alberta.

Building on our successful work at the adjacent Unit 16 Power Plant, our team quickly developed a cost-effective and durable piling design suited to the site’s challenging soil conditions.

The project included 709 piles supporting 40 modular Block Box data centres, transformers, a pipe rack, and a communications tower, along with full cutting and capping services.

Thanks to our engineering expertise and experience in the area, the piling work was completed ahead of schedule and on budget, helping Hut 8 bring its facility online quickly in a highly competitive industry.

The entire project was finished two months ahead of the original timeline, and we are proud to have played a key role in its success.

Medicine Hat Substation (In Progress)

Inland Screw Piling is back in Medicine Hat, building the foundation for a new substation. Our team has previously engineered, fabricated and installed piles in the area for the Unit 16 Power Plant and the Hut 8 Bitcoin Mining Facility, and that local experience carries straight into this project.

The photos below follow the job as it progresses: screw pile installation, piles in place across the site, and pile caps being welded. Photos of the completed foundation will be added once the work is finished.